Engineering of your process installations!
Brush Up on Various Technical Issues - with Specific Practical Work Arounds.
If you have a special needs we can make a beskoken Training Seassion.
No | Training Course | Details | |
TC-101 | PED ruleset for Pressure Piping and Equipment | ||
TC-102 | Directive: Machinery Directive; Risk Analysis, CE-marking etc. | ||
TC-103 | Directive: ATEX Directive; Classification, Risk Analyses etc. | ||
TC-151 | Efficient 3D Design & Space Management | ||
TC-161 | Efficient Project Execution and Lean Engineering | ||
TC-201 | Conciderations and Preparations to make! | ||
TC-202 | General Piping Design according to EN13480 | ||
TC-203 | Design for Easy Manufacture and handling of Sheilding Gas | ||
TC-204 | Dead Leg, Bending Radius etc in relating to CIP of piping | ||
TC-220 | Pipe Design bering more efficient based on Pipe Series | ||
TC-221 | Design rules and Best Practice for Steam Piping Systems. | ||
TC-301 | Welded Stainless Steel Piping for Water Installations | ||
TC-302 | Prevention of Polution of Water Installation | ||
TC-311 | Heating Installation; General | ||
TC-321 | Cooling Installation; General | ||
TC-331 | Ventilation; Fire Protection DS428 | DK Ruleset | |
TC-332 | Ventilation; Industrial Kitchens EN16282 | ||
TC-333 | Based on Power Plant Ducting with 16-20 m/s as standard | ||
TC-334 | Ventilation; Parking Ventilation | DK Ruleset | |
TC-341 | Instrumentation; General | ||
TC-353 | Electrical: Equi-Potential Bonding | From Concrete Rebars to Piping Installations | |
TC-401 | Unit Operations; Spray Drying and Power Handling | ||
TC-402 | Unit Operations; Clean Water - HPW and WFI | ||
TC-403 | Unit Operations; Cleaning of Installation CIP and SIP | ||
TC-404 | Unit Operations; Kill Plant | ||
TC-405 | Unit Operations; Neutralisation Plant | ||
TC-501 | |||
TC-951 | Commissioning (Idriftssættelse) | IQ, OQ, PQ, SAT & FAT | |
TC-952 | Contractor side of DS3090 Commissiong |