Engineering of your process installations!
No. | Area of Service | Ref. | Descriptions | |
P-001 | An Industrial approach to Building Utility | |||
P-011 | FTDD - Fast Track Detail Design - Offices | How to do efficient Basic through Detail Design for Office Buildings | ||
P-012 | FTDD - Fast Track Detail Design - Appartment Buildings | |||
P-021 | FTDD - Fast Track Detail Design - Pharma Industry | How to do efficient Pharma Engineering from Basic to Detail Design | ||
P-031 | FTDD - Utilizing Engineering Data for Operation | Generating Big Data through Engineering with high level tools | ||
P-051 | Process Design: General Concept Design | Sizing of unit Operation and their inter-dependensies. | ||
P-052 | Process Design: Process Flow Diagrams (PFDs) | Generation of PFD for Process Plants | ||
P-053 | Process Design: Pipe and Instrumentation Diagrams (PIDs) | Generation of PID for Process Units | ||
P-081 | Bespoken or General according to Danish DS452 (Denmark) | |||
P-082 | Insulation Specifications: Ducting Installations | Bespoken or General according to Danish DS452 (Denmark) | ||
P-084 | Insulation Specification for AVEVA PDMS | Specification according to various Insulation Classes | ||
P-085 | Insulation Specification for REVIT | Parameter Input for Generation of Insulation Series in REVIT | ||
P-089 | Insulation and Tube Surface Treatment Specification | Corrosive Protecting of Pipes and Insulation Cover | ||
P-091 | Various Pipe Series Definition. Relation Usage & Media: Ref#3 | |||
P-092 | Cats & Spec Input for AVEVA PDMS inclusive of Programming | |||
P-093 | Parameter Input for Generation of Pipe Series for REVIT. | |||
P-101 | Detail calculation of Fittings, Tube, Olets, Test Pressure etc. | |||
P-102 | Detail calculation of Fitting, Tube, Olets, Y-pieces etc. | |||
P-103 | ||||
P-104 | 3D Plant Design of Pipe Installations | |||
P-105 | Pipe Isometrics; BoQ etc. | |||
P-107 | CONVAL by FIRST Supported | |||
P-108 | CONVAL by FIRST Supported Calculation | |||
P-109 | CONVAL by FIRST Supported | |||
P-110 | Venturi Measurements of Pressurized Gas, Air and Flue Gas | |||
P-111 | Domestic and Technical Water Installations | |||
P-112 | Domestic and Technical Water Installations | |||
P-113 | Prodduction of Technical Hot Tap Water | |||
P-114 | Dealkalization of water for 0 to 6dH and Osmosiss Treatment | |||
P-115 | Traditional Press and Compress assembled Steel and PEX tube | |||
P-118 | High Pressure Installations | |||
P-119 | Quality, Leakage, Breakage Surveillance of Water Distrubtion | |||
P-121 | Piping and Metering Arrangengement | |||
P-122 | Heat Exchanging and Circulation Pumps | |||
P-123 | Traditional or Modern Hydraulic Balancing | |||
P-124 | Selv optimizing Mixing Loop for Floor Heating Systems | |||
P-125 | Heating of Air from AHU's via Mixing Loops with pump Cont. Valve | |||
P-126 | Traditional Radiator-based Building Heating | |||
P-128 | Design of Floor Heating with Hose Layout and Control System | |||
P-129 | Bespoken Units with extended Fault Survailance | |||
P-131 | Piping and Metering Arrangengement | |||
P-132 | ||||
P-135 | Cooling of Air from AHU's | |||
P-136 | Cooling of Technical Rooms - Server, Switch Gear, Printing etc. | |||
P-139 | Bespoken Units with extended Fault Survaillanc | |||
P-141 | Including Pump Wells, Rat stops etc. | |||
P-142 | Sewage Installations: Installations in Building | |||
P-143 | Design including Heat Trace | |||
P-144 | ||||
P-145 | Biowaste from Industrial Kitchen | |||
P-146 | Oil and Fat separators with buoyancy protection | |||
P-151 | ||||
P-152 | Burner Gas Station | |||
P-153 | ||||
P-161 | Pressure vessels - reference up to 600C @ 600 Barg | |||
P-162 | Pressureless Storage Vessels | |||
P-164 | Design of Destillation tower with internal section with bells | |||
P-166 | Double Wall Design with Vacuum void for Insulation | |||
P-171 | Air and Flue Gas Ducting for Power, FGD Plants and Heavy Industry | |||
P-172 | Normal Building Applications | |||
Design of Special Attenuators | ||||
P-174 | HEPA Filtret and Humidified Clean Air | |||
P-175 | Duct Systems: Industrial Kitchen Ventilation | EN16282 based ventilation for Commercial Kitchens | ||
P-176 | According to Local Regulation - in Denmark according to DBI rules | |||
P-177 | Reducing Transmitted Noice from Axial Induced Draft Fans | |||
P-180 | Flow Measurements in Air and Flue Gas Ducting | |||
P-181 | Electrical Supply for Machinery Installation | |||
P-182 | Electrical: Power Distribtion - General | Electrical Supply for Building Installations | ||
P-183 | Generator Set with Diesel Engineer, Insulatoin Hood etc. | |||
P-184 | Specification of UPS system, Battery Package, PDB's etc. | |||
P-185 | Installations, Steel Structures, Elevators, Rebars in Concrete Struc. | |||
P-187 | General, Decorative, Working Lighting etc. | |||
P-190 | Genneral Arrangement, Detail design etc. | |||
P-191 | Control Valves, Measuring etc. | |||
P-192 | Hook-up with Cabling, Instrument Tubing and Accessories | |||
P-193 | Design of Remote I/O systems with Cabinet Detail Design | |||
P-194 | Design of Pneumatic Valve Cabinets for e.g. Valve Operation | |||
P-195 | Measuring of Correct Weater Data | |||
P-197 | FD - Functional Descriptions per Functional Unit | |||
P-198 | Back bone for the Intelligent House | |||
P-199 | Control System: BMS and SCADA specification | |||
P-201 | HPW, WFI, CIP, SIP, Buffer Preparation, Kill, Neutralization etc. | |||
P-202 | Steam, Condensate, Water, Sewage, Heating, Cooling etc. | |||
P-211 | Ultrafiltration, Fermentation, Sedimentation etc. | |||
P-212 | | |||
P-214 | Suger Based Fermentation Installation | |||
P-221 | Piping for Pharma including Automated Design Validation: Sample | |||
P-223 | Storage Unit with Heating/Cooling and Circ. Pumps plus Dist. Loop | |||
P-225 | CIP Fluid Mixing/Preparation and Heating plus Distribution Loop | |||
P-227 | Reception, Storage and Deliver of Lye and Acid Solvents. | |||
P-232 | Product HCL Treatment | |||
P-235 | Product Extraction Via Ethanol Solvent and Sedimentation | |||
P-236 | Product Separation / Concentration / Harvesting with Centrifuges | |||
P-237 | Product Filtering wiht Ultrafiltration Units. | |||
P-238 | HPLC Units and Purification Plants | |||
P-241 | Kill Plant for Waste Water Treatment to remove GMO. | |||
P-243 | Neutralization Plants for Temperature and pH adjustment | |||
P-244 | Neutralisation Plants for pH adjustment | |||
P-251 | Buffer Preparation for HPLC Columns Operation | |||
P-261 | Industrial Air and Filtered for Clean Grade for Pharma | |||
P-271 | General Mechanical Engineering - Pumps, Fans, Agitators etc. | |||
P-272 | General Mechanical Engineering - Heat Exchangers, Tank etc. | |||
P-281 | ||||
P-291 | Design of Laboratories, Production Room etc. | |||
P-293 | ||||
P-295 | Ultrafiltration Installation in Food and Food Ingridient | |||
P-297 | Detail Design of Curdmaster Production Lines. | |||
P-301 | Ref#1 | Heat Pump Installation in relation with Power Plants | ||
P-306 | Heat Pump Installation in relation with Power Plants | |||
P-308 | Heat Pump Installation: Safety Installations | Safety around Class 1 Media Based Compressors (EN378) | ||
P-311 | Saturated and Superheatet Steam with auxilary Systems | |||
P-312 | Same as P-311 but with Delivery of Pipes and Steel | |||
P-313 | Energy for e.g., Cooling Production and Supplementary Heating | |||
P-314 | Silencer, Attenuation Calculations, Standpipe etc. | |||
P-315 | Main Steam; Pressure Reduction and Condensate | |||
P-316 | ||||
P-317 | Downcommer, Connection pipes, SRV Blow off etc. | |||
P-318 | Piping for General Utility and Auxilary Systems | |||
P-319 | Dampers, Duct & Diffuser Design, Sound Attenuators etc. | |||
P-320 | Design of Ducting, Piping and Steel Structures | |||
P-321 | General Storage Facilities. | |||
P-322 | Ref#1 | Fuel, Special Oil etc. | ||
P-323 | Fuel, Special Oil, Lye, Acid etc. | |||
P-324 | ||||
P-325 | ||||
P-326 | Lye, Acid etc. | |||
P-329 | ||||
P-330 | ||||
P-331 | Unit for Central Heating and Central Hot Tap Water. | |||
P-333 | Unit for Production of Hot Tap Water in Vessel | |||
P-334 | Tecnical Room - Full Installation | |||
P-337 | Expansion Unit controlled by BMS | |||
P-341 | Production from either District Cooling or Chiller Feed. | |||
P-342 | Cooling with Evaporator Tower for Industrial Application | |||
P-343 | Chillers with internal and external Natural Cooling Fans | |||
P-344 | Cooling with Amonium Compressors | |||
P-345 | Producing Cooling from Heat Recovery Source | |||
P-347 | Expansion Unit controlled by BMS with survaillance of Glycole % | |||
P-352 | ||||
P-361 | Installation Shafts with Piping, Cable Trays, and Platform | |||
P-372 | Buffer Preparation for General Industry | |||
P-374 | Reception, Storage and Deliver of Lye and Acid Industry Grade | |||
P-381 | Feeding , Air Supply and Extraction, CIP and Product Handling | |||
P-382 | Feeding , Air Supply and Extraction, CIP and Product Handling | |||
P-385 | Specification of Standard Filter or Bespoken Solution | |||
P-387 | Installation of Centrifuges with Supporting Utilities | |||
P-389 | Installation of Decanters with Supporting Utilities | |||
P-399 | Pneumatic Transportation, Cooling, Ventilation etc. | |||
P-401 | Hospital and Classified Waste Handling | |||
P-411 | Temperature reducing Fogging System | |||
P-416 | Design of Ducting, Structural Steel, Platform, Piping etc. | |||
P-419 | ||||
P-428 | Design of Ash Transportation from e.g., Electric Precipitator | |||
P-441 | Power Plants FGD; Chiyoda CT-121 Plant Design | |||
P-442 | > Power Plant FGD; Chiyoda CT 121 - Duct Design | |||
P-446 | Power Plants FGD: Mitsubishi Plant Design | |||
P-451 | System with pressure above 200 barg @ 200C | |||
P-461 | Oil & Gas Mechanical: Rotating Equipment | Pumps, Fans, Dynamos, Turbines (Gas+Steam), Agitators etc. | ||
P-462 | Oil & Gas Mechanical: Static Equipment | Heat Exchangers - Fired, Plate, Tube/Shell, Vessel, Tanks, Mixers | ||
P-463 | Oil & Gas Mechanical: Piping Design | Detail Pipe Design with Pipe Stress Calculations | ||
P-466 | Electrical Heat Trace of Pipe Instalation with advanced Survaillance | |||
P-467 | ||||
P-468 | Oil & Gas Electro: Small Power Distribution | Small Power Distribution with PDB and Cable Design | ||
P-471 | Machinery Room, Ballast and Trim tanks | |||
P-472 | Marine: Outfitting in General of Installations | Installations for e.g., Kitchen/Kabys, Living Quarters etc. | ||
P-481 | Desing of Gas Storage, Cooling Plant for Cryogenic Storage | |||
P-482 | Marine: Chemical Tankers | |||
P-483 | Marine: LNG Tankers with Cooling Central | |||
P-491 | Delivery of Fish Feed to Free Floating Fish Farms | |||
P-501 | General Platform design for e.g. Power, Incineration and Industry | |||
P-502 | General Platform design for Clean Installation in e.g. Pharma | |||
P-511 | ||||
P-521 | Designed wihtout Heatloss Sort Circuit at support Points | |||
P-531 | Bespoken Pipe Bridges for Various Application | |||
P-533 | Shaft with Installations and Platforms. | |||
P-535 | Structural Steel, Supports, Platforms and Access Ways. | |||
P-541 | High Load Capacity - Trucks etc. | |||
P-581 | Interior: Control Room | Layout of Control Room with Meeting and General Staff Facilities | ||
P-611 | Electrical Users, Spare Parts, Cable Routing, Signals etc. | |||
P-615 | Procurement Application with PO Generation and Accounting | |||
P-617 | Database: Pipe/Process Installation Price Calculation | Cost Calculation incl. e.g., QA/QC, Component Handling, Cabling etc. | ||
P-621 | Relation between Usage & Media Codes Ref#3 | |||
P-631 | Definition of Details for Offices, Clean Rooms, Technical Rooms etc. | |||
P-633 | Operation, Safety, Frost & Vandalism protection etc. | |||
P-632 | Database: Maintenance Planning Application | |||
P-641 | Database for easy definition and Sizing of Water, Sewage & AHU's | |||
P-651 | Database for easy definitoin of loads on Civil Structures. | |||
P-661 | Software: AVEVA PDMS - Administration | |||
P-662 | Design Module: Piping, Equipment, ASL, Steel, HVAC, Cable Tray | |||
P-663 | Software: AVEVA PDMS - Draft/Isodraft etc. | |||
P-664 | Software: AVEVA PDMS - Cats & Spec | |||
P-665 | Software: AVEVA Program for Automated Engineering | |||
P-666 | Ducting for Heavy Duty Industry and Power Plants | |||
P-667 | Design of Stairs according to Norms | |||
P-668 | > AVEVA Automated Engineering: Penetrations | Handling of Wall and Floor Penetrations | ||
P-669 | > AVEVA Automated Engineering: Pipe Design Validation | Design Validation of Pharma Piping - Drain, Dead Leg, Bending etc. | ||
P-670 | > AVEVA Automated Engineering: Pharma Pipe Supports | Automated Design and Drafting of bespoken Pharma Supports | ||
P-671 | Software: COMOS - Plant Design Tool | Siemens COMOS for PID, Electrical, Control etc. | ||
P-675 | Software: SPE - Smart Plant Electrical | Ingergraph Smart Plant Package for Electrical Design | ||
P-681 | Software: CONVAL from F.I.R.S.T | Flow Sizing and Selection of Valves, SRV, Orifices etc. | ||
P-683 | Software: PIPE-FLO from Engineered Software | Flow Calculation and Pump Sizing | ||
P-691 | Software: DXT EN13480 | |||
P-692 | Software: DXT EN13445 | |||
P-695 | Software: ROHR2 | PIPE flexibility Investigation acc. EN and ASME | ||
P-701 | De-gassing of Purge Water from the Salt Horst | |||
P-711 | Mechanical Design: Ash Cooler Application | Ashh Cooler for Cyclones, Fabric Filters etc. | ||
P-712 | Mechanical Design: Fabric Filters | Bespoken Fabric Filter Solutions | ||
P-731 | Protecting Ducting at e.g. FGD-plants from low pressure (Vacuum). | |||
P-741 | Mechanical Design: Destillations Columns | |||
P-751 | Mechanical Design: Spray Dryer | Design of Chamber with Atomizer | ||
P-761 | Straw Handling Facilities | |||
P-762 | Mechanical Design: Straw Processing - Scredding | String and Stone removal plus Scredding | ||
P-801 | Primerily Personel Transport with Goods Capability | |||
P-806 | Transportatoin of Personel and Goods. | |||
P-811 | Handling of Vessels for Milirary base on Greenland | |||
P-821 | ||||
P-901 | Machinery Safety: CE-marking and Risk Analysis | Machinery Directive | ||
P-911 | Pressure Systems: CE-marking and Risk Analysis | Pressure Directive | ||
P-921 | ATEX Directive | |||
P-931 | ||||
P-932 | Visualization of Project - Walk Throughs | Walk Through Video from February 2001 of a Boiler Plant. | ||
P-941 | FAT Test Procedures | Functional Unit based Test Procedures | ||
P-942 | SAT Test Procedures | Functional Unit based Test Procedures | ||
P-943 | DS 3090 Test Paradigm | Test according to Danish DS3090 Commisioning Standard | ||
P-944 | IQ - Installation Qualification - Test Schemes | Database Generated Test Schemes | ||
P-945 | OQ - Operation Qualification - Test Schemes | Database Generated Test Schemes | ||
P-949 | Pressure Testing Procedures | Testing Procedures and Calculation of Test Pressure | ||
P-951 | IQ, OQ, PQ, SAT & FAT | |||
P-952 | Contractor side of DS3090 Commissiong | |||
P-961 | Sound & Vibration; Sound Measuring | |||
P-971 | Noise Propagation from Stacks: Calculation | Based on Lydteknisk Institut now FORCE Akustik test scheme |