Engineering of your process installations!
2021-09-20
Lead Mechanical Engineer for MO Group (Metso:Outotec, Frankfurt, DE) for Various Project within Metalurgy Industry and Chemical Industry based on Fluid Bed Combustion
Metso:Outotec
Oile Storage for Special Oil @ Aarhus Havn
Oil Storage for Special Oil such as Chain Saw Oil, Hydraulic Air, Motor Oil etc. 3D of overall arrangement.Design of Piping, Structural Steel, Platforms / Gangways and Access stairs & Ladder, Cable Tray, Pump Sizing and Selection etc.
Oil Storage for Special Oil such as Chain Saw Oil, Hydraulic Air, Motor Oil etc. 3D of overall arrangement.Design of Piping, Structural Steel, Platforms / Gangways and Access stairs & Ladder, Cable Tray, Pump Sizing and Selection etc.Here is the Loading and Unloading Rack.
Waste Water Neutralization @ Pharmaceuticaul Plant
Neutralization Plant for handling Waste Water at a Pharmaceutical Factory. Capable of Cooling and adjusting pH-level. Design of Tanks with Agitators, Piping, Support Steel. Process Control, Instrumentation, Platforms and access ways.
Neutralization Plant for handling Waste Water at a Pharmaceutical Factory. Capable of Cooling and adjusting pH-level. Design of Tanks, Piping, Support Steel. Process Control, Instrumentation etc.
Cooling Central @ Herlev Hospital (DK)
Design af a new Cooling Central at Herlev Hospital in Copenhagen. Design with 4 off Johnsson Compressors with space for 2 add-on Compressors. Scope was General Arrangement and Detailed Design of Piping, Support Steel, Cable Trays etc.
Building Utilites - Insstallation Shaft @ Company Head Quarters
Design and Arrangement of Installation Shaft - Structural Steel with Access Platforms and Ducting Arrangement for Comfort Ventilation based on AHU's placed on the roof.
Building Utilites - Installation Shaft @ Company Head Quarters
Design of Steel Structure for Technical Shafts - here arrangement of Shaft and Steel Structure on the Roof.
Installations Shaft with Piping Installation for Heating, Cooling, Water, Sprinkling and Sewage. Here basement with connection Technical Room etc.
Building Utilites @ Company Head Quarters
Here Steel Structure for Roof Installation with Support Frame for a Solar Panel Wash Trolley.
Installations Shaft with Piping Installation for Heating, Cooling, Water, Sprinkling and Sewage. Here Mixling Loop for Cooling the CO2 compressor for Frost Storage Rooms.
Biomass Processing - Extracting Wax from Straw
Design of factory for extracting Wax from Straw. Design of Straw reception and Processing, De-watering, De-colloring and Pacing incluning Facility Design with Roads and Building Utilities.
Design of factory for extracting Wax from Straw. Design of Straw reception and Processing, De-watering, De-colloring and Pacing incluning Facility Design with Roads and Building Utilities.Here Straw Reception is Shown.
Design of factory for extracting Wax from Straw. Design of Straw reception and Processing, De-watering, De-colloring and Pacing incluning Facility Design with Roads and Building Utilities.Here Utilities Compressed Air and Central Heating
Design of factory for extracting Wax from Straw. Design of Straw reception and Processing, De-watering, De-colloring and Pacing incluning Facility Design with Roads and Building Utilities.Here Central Heating
General Arrangement of Chemical Plant
General Arranement and Duct Design of a Chemical Plant in China made for Danish Haldor Topsøe.
Detail Design of Piping Installation for a Chemical Plant
Detail Design of Piping Installation for a Chemical Plant in China made for Danish Haldor Topsøe. The Pipe Spools were design for internal Rubber Lining.
Steam Piping Design for Boiler @ Qatar Pearl GTL
Steam Piping for Start-up Boiler for the Qatar Pearl GTL (Gas to Liquid). Detail Design according to EN 13480 including Pipe Flexibility Calculations.
General Arrangement of Chemical Plant including Duct Design
Steel Structure for Silo Support @ Waste Incineration Plant
Steel Structure Design for 2 off Silos for FGD plant at a Waste Incineration Plant - Nordforbrændingen I/S (now Norfos).
EN13480 Pipe Design for Heat Pump based Heat Recovery System
Pipe System at Vestforbrændingen I/S - the largest Waste Incineration Plant in Denmark - for a Heat Recovery Project using Heat Pumps for upgrading the temperature useable for District Heating. Here Large Bore Piping at Circulation Pump is Shown with Olets and Temperature Sensor Pocket.
Pipe System at Vestforbrændingen I/S - the largest Waste Incineration Plant in Denmark - for a Heat Recovery Project using Heat Pumps for upgrading the temperature useable for District Heating. Here Heavy Duty Pipe Support with Lateral Fix-Points
Pipe System at Vestforbrændingen I/S - the largest Waste Incineration Plant in Denmark - for a Heat Recovery Project using Heat Pumps for upgrading the temperature useable for District Heating. The DN500 piping around the Pump were design with Pipe Flexibility Calculations to reduce Loads on Pump Nozzles.
Pipe System at Vestforbrændingen I/S - the largest Waste Incineration Plant in Denmark - for a Heat Recovery Project using Heat Pumps for upgrading the temperature useable for District Heating. Here Heavy Duty Pipe Support and Lateral Fix-Points
Pipe System at Vestforbrændingen I/S - the largest Waste Incineration Plant in Denmark - for a Heat Recovery Project using Heat Pumps for upgrading the temperature useable for District Heating. Here Heavy Duty Pipe Support with Spring Support for Large Bore Piping
Pipe Bridge Design for Vestforbrændingen I/S
Pipe System with Pipe Bridge at Vestforbrændingen I/S - the largest Waste Incineration Plant in Denmark - for a Heat Recovery Project using Heat Pumps for upgrading the temperature useable for District Heating.
EN13480 Pipe Design with Pipe Flexibility Calculations
Pipe Design for a Super Critical Process with Design Parametres 300 barg @ 300C with special Piping in Inconel. The Super Critical Process transformed Bio-Waste directly to Bio Diesel.
Sample of Report from Load Specification Database
P-Engineering devellops databases for Definition and Compiling Load Data for Larger Projects; where e.g. the Global Positions are imported form a BIM model. Database handles all definitions of load interface, Earthing etc.
Ethonol Destillation Plant @ API factory (DK)
Destillatoin Plant on an API - Active Pharmaceutical Ingredient - factory in Denmark, where the Ethanol used for Sedimentation were regenerated in the Destillations columns and mostly reused.Here Pipe Bridge to the Ethanol Starage Facility.
Destillatoin Plant on an API - Active Pharmaceutical Ingredient - factory in Denmark, where the Ethanol used for Sedimentation were regenerated in the Destillations columns and mostly reused .
Destillatoin Plant on an API - Active Pharmaceutical Ingredient - factory in Denmark, where the Ethanol used for Sedimentation were regenerated in the Destillations columns and mostly reused .In the background the Pipe Bridge and the Ethanol Starage Facility are visible.
Kill plant @ AGC Biologic (DK)
Kill Plant for AGC Biologic for Batch Operation. P-Engineering handled overall 3D Arrangement, Design and Manufacturing Drawings for Piping, Ducting, Cable Tray, Electrical Equipment etc.
Buffer Preparation for supplying HPLC
Overview of the Buffer Preparation Plant at AGC Biologic in Copenhagen design be P-Engineering. The whole Buffer Prep Installation were later demolished by P-Engineering and replaced with a solution based on disposable bags. Pipe Design was made with Pipe Bending and Pulled Tees to reduce Construction Time and QC on the Execution.
Overview of the Buffer Preparation Plant at AGC Biologic in Copenhagen design be P-Engineering. The whole Buffer Prep Installation were later demolished by P-Engineering and replaced with a solution based on disposable bags.Pipe Design was made with Pipe Bending and Pulled Tees to reduce Construction Time and QC on the Execution.
Design of Main Technical Room
Design of Main Technical Room - Especially handling Penetrations (Revit = Voids) between Piping (and Ducting plus Cable Tray) with actual geometry as a database item.
Flue Gas ducting - Presbutarian Hospital NYC, NY
A new Gas Turbine was added to the Hospitals Power Plant, and CFD calculations were made to ensure, that the back pressure was not to high for the turbine when increasing the amount of Flue Gas. Part Calclulation of one of the Steam Boilers
RenoNord - Ducting for SA and PA Air and FGR
Design of Ducting System for the Waste Incineration Plant RenoNord for BVW - Sizing, Detail Design with calculation of Plate Thicknesses, Stiffeners, Buck-stay corners as well ad 3D arrangement and manufacturing drawings.
Duct Design for Herning Power Plant
Design of Ducting for ALSTOM for the Utility Power Plant in Herning in connection with an new FGD plant for Flue Gas Cleaning. Engineering of Ducting, Support and Flexible Connections
Fluid Bed Furnace - ANSYS Rotation Sum
Evaluation of FEM results of e.g., rotation sum for Fluid Bed Furnaces to evaluate both general Stress and Strain as well as Rotation Sum for evaluation Refractory Lining Conditions.
> Google Maps Link
Copyright © All Rights Reserved
CVR Number: DK-55861056
Bank Account 6695 - 1003634023
[.]